Presented at INFOCUS 22
Session ID:101210
With all of the pressure on today’s supply chain, Dayton Lamina was losing business due to fill rates. Dayton Lamina’s division (PCS) wanted to better utilize JD Edwards by removing their bolt-on WMS and Scanning infrastructure. They needed tighter integration of data and reduced costs. Their business objective was to reduce errors in shipping, increase the productivity of their material handlers and reduce the added cost of supporting multiple systems. Their success story was built around better utilization of JD Edwards native functionality and taking advantage of an Orchestration based scanning solution. Objectives How to reduce bolt-on solutions and reduce complexity to maximize your investment in and the power of JD Edwards.